Impact of project briefing clarity on construction project performance
- 3 October 2022
- journal article
- research article
- Published by Taylor & Francis in International Journal of Construction Management
- Vol. 22 (13) , 2504-2516
Abstract
Defining a clear project brief at an early stage is critical for the project success. A lack of project brief clarity can cause design and construction changes or errors throughout project delivery, which ultimately leads to project time and cost overruns. This research proposes a dynamic simulation model to evaluate the overall impact of briefing on cost and time performance of construction projects. The causal feedback loop model portraying the impact of briefing on project cost and time performance is developed. The interrelationships that exist among the influencing factors incorporated into the stock and flow model of the project briefing. Then, the proposed model is applied in a road project to assess its applicability and performance. The results indicate that a clear project brief aid in reducing brief changes, design changes, and construction changes throughout project delivery, which can ultimately improve project cost and time performance. Despite the fact that the clear brief increases required budget and duration for the project briefing, it still represents good value to the project cost and time performance overall.Keywords
This publication has 21 references indexed in Scilit:
- Determining the Appropriate Proportion of Owner-Provided Design in Design-Build Contracts: Content Analysis ApproachJournal of Construction Engineering and Management, 2012
- Effect of project characteristics on project performance in construction projects based on structural equation modelExpert Systems with Applications, 2009
- Investigation of Critical Success Factors in Construction Project Briefing by Way of Content AnalysisJournal of Construction Engineering and Management, 2006
- Drivers for dynamic brief development in constructionEngineering, Construction and Architectural Management, 2004
- Improving design quality through briefing automationBuilding Research & Information, 2003
- Design quality in pre-project planning: applications of the Project Definition Rating IndexBuilding Research & Information, 2003
- System dynamics modeling of design and build construction projectsConstruction Innovation, 2002
- Building Project Scope Definition Using Project Definition Rating IndexJournal of Architectural Engineering, 2001
- Investigating the effect of initial scope establishment on the performance of a project through system dynamics modellingEngineering, Construction and Architectural Management, 2001
- Model for Public Sector Design-Build Project SelectionJournal of Construction Engineering and Management, 1998