Examination of emergency assembly areas based on planning criteria after the two major earthquakes on 6 February, 2023: A case study from Turkey
Authors:
Open Access
- 30 July 2024
- journal article
- Published by EnPress Publisher in Journal of Infrastructure, Policy and Development
- Vol. 8 (7) , 3917
Abstract
This study aimed to examine the compliance of post-disaster emergency assembly areas with their planning criteria in the Battalgazi district of Malatya province. This district is one of the settlements that was most affected by the two big earthquakes that occurred in Türkiye on 6 February 2023. The emergency assembly areas were evaluated qualitatively based on the criterion of “appropriateness”, with the sub-variables of “usability”, “accessibility”, and “safety”. They were also evaluated quantitatively based on the criterion of “adequacy” with the sub-variable “per capita m2”. There are a total of 103 neighborhoods in the district. However, there are only eight emergency assembly areas in total within its boundaries. According to the results of this study, only 7.5% of the current population of the district resides within 500 m of the emergency assembly areas. The fact that four emergency assembly areas (Hürriyet Park, Şehit Kemal Özalper High School, the Community Garden, Battalgazi Municipality) are situated next to each other and there are emergency assembly areas in only six of the 103 neighborhoods within the municipal boundaries shows that were significant problems in the decisions made regarding their locations. In addition, it was determined that there were disadvantages in terms of accessibility and usability within the criterion of appropriateness, while there were some positive aspects in terms of safety. When examined with regard to the criterion of adequacy, it was determined that the emergency assembly areas at Mişmiş Park, the Community Garden, Battalgazi Municipality, and Şehit Kemal Özalper High School were most adequate, while the emergency assembly areas at Hürriyet Park, Fırat Neighborhood Mukhtar, Nevzat Er Park, and 100 Yıl İmam Hatip Secondary School were least adequate.Keywords
This publication has 14 references indexed in Scilit:
- Analysing The Planning Criterias of Emergency Assembly Points and Temporary Shelter Areas: Case of İzmir-KarşıyakaJournal of Planning, 2018
- Locating temporary shelter areas after an earthquake: A case for TurkeyEuropean Journal of Operational Research, 2015
- Urban morphology as a tool for supporting tsunami rapid resilience: A case study of Talcahuano, ChileHabitat International, 2014
- Site Selection Criteria for Sheltering after Earthquakes: A Systematic ReviewPLoS Currents, 2014
- A Comprehensive Evaluation Model for Earthquake Emergency Shelter2012
- Decision Support for Urban Shelter Locations Based on Covering ModelProcedia Engineering, 2012
- The Application of TOPSIS Method in Selecting Fixed Seismic Shelter for Evacuation in CitiesSystems Engineering Procedia, 2012
- Selection of emergency shelter sites for seismic disasters in mountainous regions: Lessons from the 2008 Wenchuan Ms 8.0 Earthquake, ChinaJournal of Asian Earth Sciences, 2011
- Earthquake Protection2002
- Patterns of sheltering and housing in US disastersDisaster Prevention and Management: An International Journal, 1995