Joint production, setup and preventive maintenance policies of unreliable two-product manufacturing systems
Authors:
- 3 August 2014
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 53 (15) , 4668-4683
Abstract
This article addresses the problem of joint optimisation of production, setup and maintenance activities of unreliable manufacturing system producing two products. Given the complexity of the problem in a dynamic and stochastic environment, the literature has treated the problem separately by considering each axis individually (setup, production and maintenance) or by combining two axes simultaneously (production-setup, production-maintenance). Following the trend of scientific research advances that supports the fact that an integrated control leads to best performances, the main objective of this paper is to provide a control policy that will simultaneously combine the production, the setup and the preventive maintenance activities. To tackle the problem, an experimental resolution approach using combined continuous/discrete event simulation models is considered. The aim is to accurately imitate the production system behaviour, and to optimise the control policy parameters which minimise the total cost incurred. An in-depth study of the effects of the system parameter variation on the performance of the studied policies is performed in order to draw meaningful conclusions and to illustrate the robustness of the proposed resolution approach.Keywords
Funding Information
- Natural Sciences and Engineering Research Council of Canada (121739-2010)
This publication has 21 references indexed in Scilit:
- Joint production and subcontracting planning of unreliable multi-facility multi-product production systemsOmega, 2015
- Integrated maintenance planning and production scheduling with Markovian deteriorating machine conditionsInternational Journal of Production Research, 2014
- Joint production and setup control policies: an extensive study addressing implementation issues via quantitative and qualitative criteriaThe International Journal of Advanced Manufacturing Technology, 2014
- Joint optimisation of maintenance and production policies considering random demand and variable production rateInternational Journal of Production Research, 2012
- Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cellInternational Journal of Production Economics, 2012
- Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cellOmega, 2011
- Integrating Preventive Maintenance Planning and Production Scheduling for a Single MachineIEEE Transactions on Reliability, 2005
- Production and preventive maintenance rates control for a manufacturing system: An experimental design approachInternational Journal of Production Economics, 2000
- Scheduling of an unreliable manufacturing system with nonresumable setupsComputers & Industrial Engineering, 1997
- Optimal control of production rate in a failure prone manufacturing systemIEEE Transactions on Automatic Control, 1986