Comparison of Real-time Control Methods for CSO Reduction with Two Evaluation Indices: Computing Load Rate and Double Baseline Normalized Distance
Authors:
- 17 August 2022
- journal article
- research article
- Published by Springer Nature in Water Resources Management
- Vol. 36 (12) , 4469-4484
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (52170102)
- Key Laboratory of Surveying and Mapping Science and Geospatial Information Technology of Ministry of Natural Resources (2020-3-3)
This publication has 30 references indexed in Scilit:
- A methodological approach to the design of optimising control strategies for sewer systemsEnvironmental Modelling & Software, 2016
- Modeling and real-time control of urban drainage systems: A reviewAdvances in Water Resources, 2015
- Output‐feedback control of combined sewer networks through receding horizon control with moving horizon estimationWater Resources Research, 2015
- Relationships between rainfall and Combined Sewer Overflow (CSO) occurrencesJournal of Hydrology, 2015
- A generalised Dynamic Overflow Risk Assessment (DORA) for Real Time Control of urban drainage systemsJournal of Hydrology, 2014
- Minimization of Sewage Network OverflowWater Resources Management, 2013
- Piece-wise linear functions-based model predictive control of large-scale sewage systemsIET Control Theory & Applications, 2010
- Multiple objective optimal control of integrated urban wastewater systemsEnvironmental Modelling & Software, 2008
- Integrating simulation models with a view to optimal control of urban wastewater systemsEnvironmental Modelling & Software, 2005
- Real time control of urban wastewater systems—where do we stand today?Journal of Hydrology, 2004