Analysis of role of time in the production process in a 4D space
Open Access
- 27 December 2016
- journal article
- Published by Private Company Technology Center in Eastern-European Journal of Enterprise Technologies
- Vol. 6 (10 (84)) , 41-48
Abstract
It was established that theory and practice of calculations of “costs-time” and attempts to examine them in a 4D space are not systemic in nature. Production process is not examined in the system, in which the result of using resources over time is not the object of an interconnected and interdependent process. Time is considered as an independent variable implicitly, which significantly narrows the possibilities of prognostic calculations when introducing advanced technologies Entering the metric space, geometric interpretation of space-and-time, makes it possible to establish the essence of time in a specific production process. It is manifested in the fact that the system of vectors of increment in time is collinear and co-directed to the corresponding vectors of an increment in volume of works. In this case, the vector of increment in time corresponds to each vector of increment in volume of works. The infinite number of vectors of increment in time corresponds to the infinite number of vectors of increment in volume of works, which is characteristic for a specific production process, causing “compressibility” and “stretching” of the time parameter along with the changes in increments in volume of work and productivity. The example of calculating prospective volumes of work in a 4D space, including basic production resources and time, was performed. The calculation demonstrated the possibility of a considerable (up to 40 %) increase in accuracy of determining the required parameter.Keywords
This publication has 10 references indexed in Scilit:
- Modelling of crystallization process of polymeric composition in space and timeEastern-European Journal of Enterprise Technologies, 2016
- Time-cost trade-offs in resource-constraint project scheduling problems with overlapping modesInternational Journal of Project Organisation and Management, 2014
- Robust Optimization for Time-Cost Tradeoff Problem in Construction ProjectsAbstract and Applied Analysis, 2014
- Using 4D CAD to visualize the impacts of highway construction on the publicAutomation in Construction, 2013
- Algorithm for Time-Cost Tradeoff Analysis in Construction Projects by Aggregating Activity-Level Singularity Functions2012
- Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical Models and Critical Path MethodJournal of Construction Engineering and Management, 2009
- 4D dynamic construction management and visualization software: 1. DevelopmentAutomation in Construction, 2005
- 4D visualization of highway construction projects2004
- The Dynamics of Business Cycles: A Study in Economic FluctuationsSouthern Economic Journal, 1951
- Zur Elektrodynamik bewegter KörperAnnalen der Physik, 1905