On the electrical tests employed during the construction of the Malta and Alexandria telegraph, and on insulating and protecting submarine cables
Author:
- Mr.C.W. SiemensMSMr.C.W. Siemens
- 1 September 1862
- journal article
- Published by Elsevier in Journal of the Franklin Institute
- Vol. 74 (3) , 166-170