Autonomous Resources-Loaded Project Scheduling System Development
Preprint
- 2 February 2024
- preprint
- Published by MDPI AG in Preprints.org
Abstract
The fast-paced evolution of artificial intelligence (AI), machine learning (ML), natural language processing (NLP), large language model (LLM) applications, and generative pre-trained transformer (GPT) have set the stage for improved and autonomous project scheduling models. This study demonstrates how project scheduling can be enhanced by employing building information modeling (BIM) to predict reliable schedules for each project element. The research is based on design science research (DSR) methodology and focus group discussion. The proposed system consists of six components: project analyzer, data warehouse, activity identifier and sequencing, activity magnitude and direct cost calculator, activity duration calculator, and schedule analyzer. Unlike other solutions, the proposed solution sequences activities based on an ML model rather than constraint matrices. The proposed solution thus enhances project performance through proactive planning and risk management. Integrating the autonomous project scheduling solution with the other components of an autonomous project management system would surmount schedule challenges and would result in greater cost efficiency and fewer delays.Keywords
All Related Versions
- Version 1, 2024-02-02, Preprints
- Published version: Buildings, 14 (4), 934.
This publication has 20 references indexed in Scilit:
- Construction schedule augmentation with implicit dependency constraints and automated generation of lookahead plan revisionsAutomation in Construction, 2023
- Graph-Based Automated Construction Scheduling without the Use of BIMJournal of Construction Engineering and Management, 2023
- Automatic generation of BIM-based construction schedule: combining an ontology constraint rule and a genetic algorithmEngineering, Construction and Architectural Management, 2022
- Comparing Natural Language Processing Methods to Cluster Construction SchedulesJournal of Construction Engineering and Management, 2021
- An Introduction to Ethics in Robotics and AI2021
- Formalizing Construction Sequencing Knowledge and Mining Company-Specific Best Practices from Past Project Schedules2019
- Text Analytics with Python2019
- Siri, Siri, in my hand: Who’s the fairest in the land? On the interpretations, illustrations, and implications of artificial intelligenceBusiness Horizons, 2019
- Automation in construction scheduling: a review of the literatureThe International Journal of Advanced Manufacturing Technology, 2015
- Construction scheduling using Genetic Algorithm based on Building Information ModelExpert Systems with Applications, 2014