A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs
- 12 January 2005
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 27 (7-8) , 804-815
Abstract
No abstract availableKeywords
This publication has 24 references indexed in Scilit:
- Multicriteria scheduling problems: a surveyRAIRO - Operations Research, 2001
- A multi-objective genetic local search algorithm and its application to flowshop schedulingIEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews), 1998
- Multi-objective genetic algorithm and its applications to flowshop schedulingComputers & Industrial Engineering, 1996
- Scheduling in flowshop and cellular manufacturing systems with multiple objectives— a genetic algorithmic approachProduction Planning & Control, 1996
- A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling ProblemJournal of the Operational Research Society, 1995
- Muiltiobjective Optimization Using Nondominated Sorting in Genetic AlgorithmsEvolutionary Computation, 1994
- A new heuristic method for the flow shop sequencing problemEuropean Journal of Operational Research, 1989
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- Four simple heuristics for scheduling a flow-shopInternational Journal of Production Research, 1978
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954