Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study
Authors:
Open Access
- 8 February 2021
- journal article
- research article
- Published by SAGE Publications in Public Works Management & Policy
- Vol. 27 (1) , 61-97
Abstract
This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security issues, selection of low-price bids, weather factors, and owner failures. Some of these are in line with findings from similar studies in other countries and regions, but some are unique to the Iraqi project sample, such as security issues and low-price bid selection. While many studies have examined factors causing delays and cost overruns, this study offers unique insights into factors that need to be considered when implementing projects for post disaster emergency reconstruction in areas impacted by wars and terrorism.Keywords
This publication has 87 references indexed in Scilit:
- Ranking of delay factors in construction projects after Egyptian revolutionAlexandria Engineering Journal, 2013
- An Investigation into the Risk of Construction Projects Delays in the UAEInternational Journal of Information Technology Project Management, 2013
- An Empirical Study of Schedule Delay Causes Based on Taiwan's Litigation CasesProject Management Journal, 2013
- Efficient genome editing in zebrafish using a CRISPR-Cas systemNature Biotechnology, 2013
- Stakeholders' Perception of the Causes and Effects of Construction Delays on Project DeliveryJournal of Construction Engineering and Project Management, 2012
- Structural equation model for investigating factors affecting delay in Indian construction projectsConstruction Management and Economics, 2012
- Risk Factors for Isolated Periventricular LeukomalaciaPediatric Neurology, 2012
- Esophageal Squamous Cell Dysplasia and Delayed Differentiation With Deletion of Krüppel-Like Factor 4 in Murine EsophagusGastroenterology, 2010
- Important causes of delay in public utility projects in Saudi ArabiaConstruction Management and Economics, 1999
- Factors influencing construction time and cost overruns on high-rise projects in IndonesiaConstruction Management and Economics, 1997