The industrial production prototype of the ITER gyrotron was tested at the new test stand in Kurchatov institute with power 1.02 MW in 240 second pulses, and 0.8MW in 800 second pulses. Simultaneously at IAP a short pulse gyrotron with an increased size cavity was tested at power 1.5-2 MW.