Developing ATC Automation in the Field: It Pays to Get Your Hands Dirty
Authors:
- 1 January 1998
- journal article
- Published by American Institute of Aeronautics and Astronautics (AIAA) in Air Traffic Control Quarterly
- Vol. 6 (1) , 45-70
Abstract
This paper describes the field assessment process that has been applied to the development of an advanced ATC automation system, the Center/Terminal Radar Approach Control (TRACON) Automation System, known as CTAS. CTAS is installed at the Denver Center and TRACON, the Ft. Worth Center, and the Dallas-Ft. Worth TRACON for development purposes. The field assessment process is focused on refining the system and on enhancing our understanding of the potential impact of the CTAS tools on problem solving, decision making, facility coordination, and workload. Key human factors assessments of CTAS are described. Because of the complexity of the ATC environment, the opportunity to assess CTAS in an operational context has provided insights that would not have been possible in simpler simulation environments.Keywords
This publication has 6 references indexed in Scilit:
- The development of the Final Approach Spacing Tool (FAST): a cooperative controller-engineer design approachControl Engineering Practice, 1996
- Design and evaluation of an air traffic control Final Approach Spacing ToolJournal of Guidance, Control, and Dynamics, 1991
- Usability Engineering: Our Experience and Evolution1988
- How to Design Usable Systems1988
- The Measurement of the Air Traffic ControllerHuman Factors: The Journal of the Human Factors and Ergonomics Society, 1980
- Field Testing: The Delicate CompromiseHuman Factors: The Journal of the Human Factors and Ergonomics Society, 1974