Design of cryogenic system for the Beijing Electron Positron Collider II upgrade

Authors:

Abstract
The Beijing Electron Positron Collider II upgrade (BEPCII-U) has been proposed to optimize the maximum collision energy and data acquisition efficiency in higher energy region (>2.1 GeV). To achieve higher luminosity at higher energies, the number of superconducting radio frequency (SRF) cavities will be doubled. The cryogenic system of the BEPCII-U employs two cryogenic plants to provide the refrigeration for the three types of superconducting (SC) devices: SRF cavities, SC multi-function magnets (MFMs) and superconducting solenoid magnet (SSM). The cryogenic subsystem for SRF cavities has been upgraded from the original 500 W to 1 kW at 4.2 K due to the increased number of SRF cavities (4 cavities). The main tasks include the design of the cooling process, 499.8 MHz cavity cryomodules, local distribution valve boxes (LDVBs) and different types of multi-channel transfer lines (MCTLs) based on existing conditions. Meanwhile, the cryogenic subsystem for SC magnets has also been upgraded to enhance the reliability of the cryo-plant and to develop new SC MFM-cryomodules and associated valve boxes. The main tasks are including the design of the SC MFM-cryomodules, a cryogenic horizontal test stand (HTS) for SC magnets and working scheme for the main screw compressors (MSCs). The cryogenic system for the BEPCII-U has been designed, constructed and commissioned since the beginning of 2021, and the detailed design is presented in this paper.

This publication has 15 references indexed in Scilit: