On-line estimation of the aerobic phase length for partial nitrification processes in SBR based on features extraction and SVM classification
Authors:
- Francisco JaramilloFJFrancisco Jaramillo
- Marcos OrchardMOMarcos Orchard
- Carlos MuñozCarlos Muñoz
- Christian AntileoCAChristian Antileo
- Doris SáezDSDoris Sáez
- Pablo EspinozaPEPablo Espinoza
- 1 January 2018
- journal article
- research article
- Published by Elsevier in Chemical Engineering Journal
- Vol. 331, 114-123
Abstract
No abstract availableKeywords
This publication has 34 references indexed in Scilit:
- Monitoring the removal of nitrogen by applying a nitrification–denitrification process in a Sequencing Batch Reactor (SBR)Bioresource Technology, 2011
- Progress in the Development of Control Strategies for the SBR ProcessCLEAN – Soil, Air, Water, 2010
- Short- and long-term effects of temperature on partial nitrification in a sequencing batch reactor treating domestic wastewaterJournal of Hazardous Materials, 2010
- Effective and robust partial nitrification to nitrite by real-time aeration duration control in an SBR treating domestic wastewaterProcess Biochemistry, 2009
- Control and modelling of partial nitrification of effluents with high ammonia concentrations in sequencing batch reactorChemical Engineering and Processing - Process Intensification, 2008
- Intelligent monitoring system for long-term control of Sequencing Batch ReactorsWater Science & Technology, 2008
- Modes of operation and pH control as enhancement factors for partial nitrification with oxygen transport limitationWater Research, 2007
- Partial nitrification—operational parameters and microorganisms involvedReviews in Environmental Science and Bio/Technology, 2006
- Novel operational strategy for partial nitrification to nitrite in a sequencing batch rotating disk reactorBiochemical Engineering Journal, 2006
- State observers for a biological wastewater nitrogen removal process in a sequential batch reactorBioresource Technology, 2001