Promoting the Investment on IPPs for Optimal Grid Planning
- 18 February 2010
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 25 (3) , 1743-1750
Abstract
This paper presents a transmission expansion planning (TEP) model which coordinates investment decisions in monopolistic transmission and decentralized generator sectors. The proposed planning approach gauges transmission congestion and security constraints with respect to transmission investments while promoting investments on independent power produces (IPPs) through incentive payments. The paper includes discussions on incentive mechanisms and prioritization among qualified IPPs for several planning scenarios. Such incentives might be necessary to trigger investments on IPPs earlier than those projected by the decentralized generation system, when the power system security is threatened. The proposed planning approach would optimize the sum of transmission investments, incentive payments to IPPs, and congestion costs along the planning horizon. The case studies illustrate how the proposed planning algorithm could be utilized in order to determine incentive payments to candidate generators when necessary, and prioritize such incentives among multiple IPP candidates.Keywords
This publication has 13 references indexed in Scilit:
- Congestion-Driven Transmission Planning Considering the Impact of Generator ExpansionIEEE Transactions on Power Systems, 2008
- Market-Based Coordination of Transmission and Generation Capacity PlanningIEEE Transactions on Power Systems, 2007
- Proactive planning and valuation of transmission investments in restructured electricity marketsJournal of Regulatory Economics, 2006
- Transmission Rights and Transmission ExpansionsIEEE Transactions on Power Systems, 2005
- Transmission System Planning-The Old World Meets The NewProceedings of the IEEE, 2005
- A capacity market that makes sense2005
- A Multiyear Dynamic Approach for Transmission Expansion Planning and Long-Term Marginal Costs ComputationIEEE Transactions on Power Systems, 2005
- Optimal Investments in Power Generation Under Centralized and Decentralized Decision MakingIEEE Transactions on Power Systems, 2005
- The Political Economy of Long-Term Generation Adequacy: Why an ICAP Mechanism is Needed as Part of Standard Market DesignThe Electricity Journal, 2002
- Test systems and mathematical models for transmission network expansion planningIEE Proceedings - Generation, Transmission and Distribution, 2002