A deep reinforcement learning based algorithm for a distributed precast concrete production scheduling
Authors:
- Yu DuYDYu Du
- Jun-Qing LiJLJun-Qing Li
- 21 November 2023
- journal article
- research article
- Published by Elsevier in International Journal of Production Economics
- Vol. 268
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (62173216)
This publication has 39 references indexed in Scilit:
- Optimized rescheduling of multiple production lines for flowshop production of reinforced precast concrete componentsAutomation in Construction, 2018
- Heuristic algorithm for ready-mixed concrete plant scheduling with multiple mixersAutomation in Construction, 2017
- Scheduling on a two-machine permutation flow shop under time-of-use electricity tariffsInternational Journal of Production Research, 2017
- Optimized flowshop scheduling of multiple production lines for precast productionAutomation in Construction, 2016
- A multi-objective GA-based optimisation for holistic Manufacturing, transportation and Assembly of precast constructionAutomation in Construction, 2016
- Optimisation of distributed manufacturing flexible job shop scheduling by using hybrid genetic algorithmsJournal of Intelligent Manufacturing, 2015
- Human-level control through deep reinforcement learningNature, 2015
- Hybrid flow shop scheduling considering machine electricity consumption costInternational Journal of Production Economics, 2013
- GA-based decision support systems for precast production planningAutomation in Construction, 2010
- An Improved Genetic Algorithm for the Distributed and Flexible Job-shop Scheduling problemEuropean Journal of Operational Research, 2010