Energy-efficient open-shop scheduling with multiple automated guided vehicles and deteriorating jobs
Authors:
- Lijun HeLHLijun He
- Raymond ChiongRCRaymond Chiong
- Wenfeng LiWLWenfeng Li
- 10 August 2022
- journal article
- research article
- Published by Elsevier in Journal of Industrial Information Integration
- Vol. 30
Abstract
No abstract availableKeywords
Funding Information
- National Key Research and Development Program of China (2019YFB 1600400)
- Fundamental Research Funds for the Central Universities (2019-YB-033)
- Fundamental Research Funds for the Central Universities
- National Natural Science Foundation of China (61571336, 62173263)
This publication has 61 references indexed in Scilit:
- Energy-efficient scheduling for a flexible flow shop using an improved genetic-simulated annealing algorithmRobotics and Computer-Integrated Manufacturing, 2013
- A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shopsInformation Sciences, 2011
- Solving a multi-objective open shop scheduling problem by a novel hybrid ant colony optimizationExpert Systems with Applications, 2011
- A contribution and new heuristics for open shop schedulingComputers & Operations Research, 2010
- Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristicsExpert Systems with Applications, 2010
- A framework to minimise total energy consumption and total tardiness on a single machineInternational Journal of Sustainable Engineering, 2008
- A review of design and control of automated guided vehicle systemsEuropean Journal of Operational Research, 2006
- A fast and elitist multiobjective genetic algorithm: NSGA-IIIEEE Transactions on Evolutionary Computation, 2002
- NP-hard cases in scheduling deteriorating jobs on dedicated machinesJournal of the Operational Research Society, 2001
- Open Shop Scheduling to Minimize Finish TimeJournal of the ACM, 1976