OPTIMAL SCHEDULING IN COLOR FILTER MANUFACTURING
Authors:
- 1 January 2005
- journal article
- research article
- Published by Taylor & Francis in Journal of the Chinese Institute of Industrial Engineers
- Vol. 22 (4) , 301-308
Abstract
A scheduling problem of the color filter manufacturing in TFT LCD industry is considered in this paper. The problem under consideration is a flow shop scheduling problem with sequence-dependent setup times. The objective is to schedule the order completion times as close to the due dates as possible to minimize the earliness/tardiness penalties, subject to the production capacity constraints and fulfillment of production demands. A modified ant colony optimization (ACO) approach is proposed to find the optimal schedule for this problem. The proposed approach was designed to focus on the practical requirements in the color filter process.Keywords
This publication has 12 references indexed in Scilit:
- Scheduling with product family set-up times: an application in TFT LCD manufacturingInternational Journal of Production Research, 2004
- Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobsEuropean Journal of Operational Research, 2004
- An available-to-promise system for TFT LCD manufacturing in supply chainComputers & Industrial Engineering, 2002
- An assembly scheduler for TFT LCD manufacturingComputers & Industrial Engineering, 2001
- An Ant Algorithm with a New Pheromone Evaluation Rule for Total Tardiness Problems2000
- Scheduling with batching: A reviewEuropean Journal of Operational Research, 2000
- A review of scheduling research involving setup considerationsOmega, 1999
- An improved Ant System algorithm for theVehicle Routing ProblemAnnals of Operations Research, 1999
- Ant colonies for the travelling salesman problemBioSystems, 1997
- Ant system: optimization by a colony of cooperating agentsIEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics), 1996