Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model
Open Access
- 3 February 2023
- journal article
- research article
- Published by Springer Nature in Scientific Reports
- Vol. 13 (1) , 1-24
Abstract
The analysis of the relationship between time and cost is a crucial aspect of construction project management. Various optimization techniques have been developed to solve time–cost trade-off problems. A hybrid multi-verse optimizer model (hDMVO) is introduced in this study, which combines the multi-verse optimizer (MVO) and the sine cosine algorithm (SCA) to address the discrete time–cost trade-off problem (DTCTP). The algorithm's optimality is evaluated by using 23 well-known benchmark test functions. The results demonstrate that hDMVO is competitive with MVO, SCA, the dragonfly algorithm and ant lion optimization. The performance of hDMVO is evaluated using four benchmark test problems of DTCTP, including two medium-scale instances (63 activities) and two large-scale instances (630 activities). The results indicate that hDMVO can provide superior solutions in the time–cost optimization of large-scale and complex projects compared to previous algorithms.Keywords
All Related Versions
This publication has 35 references indexed in Scilit:
- A hybrid simulation-optimization approach for the robust Discrete Time/Cost Trade-off ProblemApplied Mathematics and Computation, 2015
- Multi-Verse Optimizer: a nature-inspired algorithm for global optimizationNeural Computing and Applications, 2015
- A trade-off between time and cost in scheduling repetitive construction projectsJournal of Industrial and Management Optimization, 2015
- A hybrid genetic algorithm for the discrete time–cost trade-off problemExpert Systems with Applications, 2012
- Metaheuristic optimization frameworks: a survey and benchmarkingSoft Computing, 2011
- Multiobjective evolutionary algorithms: A survey of the state of the artSwarm and Evolutionary Computation, 2011
- Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in constructionAutomation in Construction, 2010
- The discrete time/cost trade-off problem: extensions and heuristic proceduresJournal of Scheduling, 2007
- No free lunch theorems for optimizationIEEE Transactions on Evolutionary Computation, 1997
- The discrete time-cost tradeoff problem revisitedEuropean Journal of Operational Research, 1995