Constraint programming approach to quay crane scheduling problem
- 1 November 2013
- journal article
- Published by Elsevier in Transportation Research Part E: Logistics and Transportation Review
- Vol. 59, 108-122
Abstract
No abstract availableKeywords
This publication has 25 references indexed in Scilit:
- Quay Cranes in Container TerminalsTransactions on Transport Sciences, 2013
- A survey of berth allocation and quay crane scheduling problems in container terminalsEuropean Journal of Operational Research, 2010
- An improved approach for quay crane scheduling with non-crossing constraintsEngineering Optimization, 2010
- A hybrid parallel genetic algorithm for yard crane schedulingTransportation Research Part E: Logistics and Transportation Review, 2010
- A fast heuristic for quay crane scheduling with interference constraintsJournal of Scheduling, 2009
- An optimal coarse-grained arc consistency algorithmArtificial Intelligence, 2005
- A crane scheduling method for port container terminalsEuropean Journal of Operational Research, 2004
- Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approachInternational Journal of Production Research, 2004
- Implementation of resource constraints in ILOG SCHEDULE: a library for the development of constraint-based scheduling systemsIntelligent Systems Engineering, 1994
- The crane scheduling problemTransportation Research Part B: Methodological, 1989