Integrated lot sizing and dispatching in wafer fabrication
Authors:
- 23 June 2010
- journal article
- research article
- Published by Taylor & Francis in Production Planning & Control
- Vol. 21 (5) , 485-495
Abstract
In this article, we investigate the integration of lot sizing and dispatch-related decisions for a wafer fabrication (hereafter referred to as wafer fab) facility. These decisions pertain to the operational planning and shop floor control (SFC) levels of its decision hierarchy. Our objective is to minimise output variability, which is an important and challenging issue for wafer fabrication due to the inherent dynamics and complexity of the operations involved. We propose a detailed lot-sizing model (called dynamic lot release planning (DynaLRP)) that captures wafer movement at each step of the process flow and prescribes a processing quota at these steps as well. We then design a dispatching rule called Largest-Remaining-Quota-First (LRQ) rule to drive wafer movement towards the direction prescribed by the lot-sizing model. A closed-loop control is formed by feeding the shop floor status back to the lot-sizing model and updating processing quota for each processing step on a regular basis. We have tested the effectiveness of our methodology in the simulated environment of a real-life wafer fab, and the results show that our methodology is effective in improving the wafer fab's performance while reducing output variability.Keywords
This publication has 11 references indexed in Scilit:
- Operational planning and control of semiconductor wafer productionProduction Planning & Control, 2006
- Design of a lagrangian relaxation-based hierarchical production scheduling environment for semiconductor wafer fabricationIEEE Transactions on Robotics and Automation, 2003
- Development of a state-dependent dispatch rule using theory of constraints in near-real-world wafer fabricationProduction Planning & Control, 2002
- Implementing new dispatching rules at SGS-Thomson MicroelectronicsProduction Planning & Control, 1999
- A simulation study of dispatch rules for reducing flow times in semiconductor wafer fabricationProduction Planning & Control, 1998
- A new formulation technique for alternative material planning—an approach for semiconductor bin allocation planningComputers & Industrial Engineering, 1997
- A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculationsIEEE Transactions on Semiconductor Manufacturing, 1996
- A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART II: SHOP-FLOOR CONTROLIIE Transactions, 1994
- ON CAPACITY MODELING FOR PRODUCTION PLANNING WITH ALTERNATIVE MACHINE TYPESIIE Transactions, 1992
- A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNINGIIE Transactions, 1992