Performance of constructing a double-deck subway station by combining the shield method and cavern–pile method
Authors:
- Mingju ZhangMZMingju Zhang
- Yi LiuYLYi Liu
- Lifeng FanLFLifeng Fan
- Pengfei LiPLPengfei Li
- 1 August 2017
- journal article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 67, 120-131
Abstract
No abstract availableFunding Information
- National Natural Science Foundation of China (51538001)
- Beijing Natural Science Foundation of China (8161001)
This publication has 9 references indexed in Scilit:
- Analytical solution for long lined tunnels subjected to travelling loadsTunnelling and Underground Space Technology, 2016
- Full stress and displacement fields for steel-lined deep pressure tunnels in transversely anisotropic rockTunnelling and Underground Space Technology, 2016
- Ground surface settlements due to construction of closely-spaced twin tunnels with different geometric arrangementsTunnelling and Underground Space Technology, 2016
- Enlarging a large-diameter shield tunnel using the Pile–Beam–Arch method to create a metro stationTunnelling and Underground Space Technology, 2015
- Shallow tunnelling method (STM) for subway station construction in soft groundTunnelling and Underground Space Technology, 2012
- Analysis of ground movement due to metro station driven with enlarging shield tunnels under building and its parameter sensitivity analysisTunnelling and Underground Space Technology, 2012
- Environmental risk management for a cross interchange subway station construction in ChinaTunnelling and Underground Space Technology, 2011
- Numerical Analysis on Deformation of Adjacent Structures due to Metro Station Construction by Enlarging Large-Diameter Shield TunnelAdvanced Materials Research, 2011
- Unified construction of running track tunnel and crossover tunnel for subway by rectangular shape double track cross-section shield machineTunnelling and Underground Space Technology, 2003