How does project size affect cost estimation error? Statistical artifacts and methodological challenges
Authors:
- Magne JørgensenMJMagne Jørgensen
- Torleif HalkjelsvikTHTorleif Halkjelsvik
- Barbara KitchenhamBKBarbara Kitchenham
- 1 October 2012
- journal article
- Published by Elsevier in International Journal of Project Management
- Vol. 30 (7) , 839-849
Abstract
No abstract availableKeywords
This publication has 37 references indexed in Scilit:
- Tests in contingency tables as regression testsEconomics Letters, 2009
- Overconfidence in absolute and relative performance: The regression hypothesis and Bayesian updatingJournal of Economic Psychology, 2009
- Variability and Reproducibility in Software Engineering: A Study of Four Companies that Developed the Same SystemIEEE Transactions on Software Engineering, 2008
- Bias and Error in Mine Project Capital Cost EstimationThe Engineering Economist, 2008
- The Phantom Menace: Omitted Variable Bias in Econometric ResearchConflict Management and Peace Science, 2005
- Bias: Table 1Journal of Epidemiology and Community Health, 2004
- What Causes Cost Overrun in Transport Infrastructure Projects?Transport Reviews, 2004
- Should observed overconfidence be dismissed as a statistical artifact? Critique of Erev, Wallsten, and Budescu (1994).Psychological Review, 2000
- Properties of the Geometric Mean Functional RelationshipBiometrics, 1988
- An Introduction to Sample Selection Bias in Sociological DataAmerican Sociological Review, 1983