Comparison of the productivity, cost and stem breakage of two- and three-machine harvest systems clearfelling a mature Pinus radiata stand
Authors:
- 2 April 2020
- journal article
- research article
- Published by Taylor & Francis in Australian Forestry
- Vol. 83 (2) , 91-98
Abstract
Damage to trees and logs during harvest and transport can result in major losses of wood volume and value. The study compared a harvester/forwarder (two-machine) harvest system, which typically is used in Australia, with a feller-buncher/processor/forwarder (three-machine) harvest system in terms of productivity, cost and felling stem breakage when clearfelling a 29-year-old Pinus radiata plantation in eastern Victoria, Australia. The study aimed to determine whether the three-machine harvest system reduced felling tree breakage while maintaining or improving on the productivity and delivered cost of the two-machine harvest system. The harvest systems were compared on adjacent sites (~1 ha each) using an elemental time study. Machine productivity was derived from cycle times using StanForD stem files to obtain merchantable tree volumes and forwarder load weights from the forwarder’s onboard scales. The three-machine harvest system was more productive and resulted in considerably less felling stem breakage than the two-machine harvest system (two broken stems compared with 21 broken stems). However, it was approximately 41% more expensive than the two-machine harvest system in terms of cost per m3 of logs delivered to roadside. Because chiplogs were cut from broken stem sections where possible, and it was unlikely that sawlog volume was lost through stem breakage (based on the minimum sawlog specifications and the length and large-end diameter of the broken stem sections), any financial losses resulting from the additional breakage in the two-machine harvest system were insignificant compared with the extra cost per m3 of logs delivered for the three-machine harvest system.Keywords
This publication has 16 references indexed in Scilit:
- Time consumption and productivity of a forwarder operating on a slope in a cut-to-length harvest system in a Pinus radiata D. Don pine plantationJournal of Forest Science, 2017
- General productivity model for single grip harvesters in Australian eucalypt plantationsAustralian Forestry, 2016
- Estimating harvester productivity inPinus radiataplantations using StanForD stem filesScandinavian Journal of Forest Research, 2013
- Machine productivity and residual harvesting residues associated with a cut-to-length harvest system in southern TasmaniaSouthern Forests: a Journal of Forest Science, 2012
- Fibre volume losses of eight softwood clearfell harvesting systems in South AfricaSouthern Forests: a Journal of Forest Science, 2012
- A harvest and transport cost model for Eucalyptus spp. fast-growing short rotation plantationsBiomass and Bioenergy, 2009
- Time consumption analysis of the mechanized cut-to-length harvesting systemSilva Fennica, 2006
- Effect of Working Conditions on Forwarder Productivity in Cut-to-length Timber Harvesting on Sensitive Forest Sites in IrelandBiosystems Engineering, 2004
- Damage to trees due to forestry operations and its pathological significance in temperate forests: a literature reviewForestry: An International Journal of Forest Research, 2001
- A ratio estimator for bias correction in logarithmic regressionsCanadian Journal of Forest Research, 1991