Minimizing total flow time on a single flexible machine
Authors:
- 20 September 2006
- journal article
- research article
- Published by Springer Nature in International Journal of Flexible Manufacturing Systems
- Vol. 18 (1) , 55-73
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performanceEuropean Journal of Operational Research, 2004
- Minimization of the Number of Tool Magazine Setups on Automated Machines: A Lagrangean Decomposition ApproachOperations Research, 2003
- A tabu search based algorithm for minimizing the number of tool switches on a flexible machineComputers & Industrial Engineering, 2003
- Scheduling with tool changes to minimize total completion time: A study of heuristics and their performanceNaval Research Logistics (NRL), 2002
- Heuristic procedures for the parallel machine problem with tool switchesInternational Journal of Production Research, 2002
- A new heuristic based on a hypergraph representation for the tool switching problemInternational Journal of Production Economics, 2000
- Minimizing the number of tool switches on a flexible machineInternational Journal of Flexible Manufacturing Systems, 1994
- A Synthesis of Decision Models for Tool Management in Automated ManufacturingManagement Science, 1993
- A Heuristic for Minimizing the Number of Tool Switches on a Flexible MachineIIE Transactions, 1988
- A shortest augmenting path algorithm for dense and sparse linear assignment problemsComputing, 1987