Ethical and psychological factors in 5S and total productive maintenance
Open Access
- 19 July 2017
- journal article
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 10 (3) , 444-475
Abstract
Purpose: The purpose of this paper is to investigate the role of ethical and psychological factors in the implementation of 5S and TPM at cement plants in Kurdistan Region of Iraq.Design/methodology/approach: The mixed methods represented in a questionnaire survey and semi-structured interviews for data collection in the framework of the case study were chosen. The questionnaire survey already has been tested.Findings: The findings of this paper revealed that ethical factors had a larger role than psychological factors in the implementation. Thus, based on the findings, organisations are recommended to provide financial and moral support to employees to enable a comprehensive implementation of 5S and TPM aimed at obtaining the desired results. Originality/value: The current paper tried to introduce a new theoretical contribution by filling the gap in the literature regarding the important role that can be played by ethical and psychological factors of employees in the successful implementation of contemporary techniques, such as 5S and TPM in industrial organizations. This is contrary to what was done most of previous studies such as Ahuja & Khamba, (2008b) Panneerselvam (2012) Singh et al. (2013) and Poduval & Pramod (2015) in the area of 5S and TPM. Where, these studies have focused on studying the other factors such as (organizational, technological, operational and others) in implementing 5S and TPM. This without realizing the fact that it is also necessary to examine factors such as (ethical and psychological) that would affect the capabilities and employee morale before and during the implementation of those techniques (5S and TPM) that are used to bring out the best productivity.Keywords
This publication has 38 references indexed in Scilit:
- Total Productive Maintenance (TPM) Implementation in a Machine Shop: A Case StudyProcedia Engineering, 2013
- Successful maintenance practice through team autonomyEmployee Relations: The International Journal, 2012
- An ISM approach for modelling the enablers in the implementation of Total Productive Maintenance (TPM)International Journal of System Assurance Engineering and Management, 2012
- Integrating human resource management into lean production and their impact on organizational performanceInternational Journal of Manpower, 2011
- A survey on lean practices in Indian machine tool industriesThe International Journal of Advanced Manufacturing Technology, 2010
- Contingency research in operations management practicesJournal of Operations Management, 2008
- Implementing 5S within a Japanese context: an integrated management systemManagement Decision, 2008
- Improving Performance through an Integrated Manufacturing ProgramQuality Management Journal, 2006
- Relationship between total productive maintenance and performanceInternational Journal of Production Research, 2004
- The impact of total productive maintenance practices on manufacturing performanceJournal of Operations Management, 2000