Optimized acceleration of repetitive construction projects
Authors:
- Ibrahim BakryIBIbrahim Bakry
- Osama MoselhiOMOsama Moselhi
- Tarek ZayedTarek Zayed
- 1 April 2014
- journal article
- Published by Elsevier in Automation in Construction
- Vol. 39, 145-151
Abstract
No abstract availableThis publication has 19 references indexed in Scilit:
- Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash FlowsJournal of Construction Engineering and Management, 2011
- Multiobjective Optimization of Time-Cost Trade-Off Using Harmony SearchJournal of Construction Engineering and Management, 2010
- Hybrid Time-Cost Optimization of Nonserial Repetitive Construction ProjectsJournal of Construction Engineering and Management, 2009
- Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic AlgorithmsJournal of Construction Engineering and Management, 2005
- Challenges in Line-of-Balance SchedulingJournal of Construction Engineering and Management, 2002
- Applying Modified Minimum Moment Method to Multiple Resource LevelingJournal of Construction Engineering and Management, 2001
- Cost Optimization in Projects with Repetitive Nonserial ActivitiesJournal of Construction Engineering and Management, 2001
- Linear Scheduling Model: Development of Controlling Activity PathJournal of Construction Engineering and Management, 1998
- Scheduling Projects with Repeating ActivitiesJournal of Construction Engineering and Management, 1998
- Resource allocation via dynamic programming in activity networksEuropean Journal of Operational Research, 1993