What causes cost overrun in highway strategic project in Indonesia?
Authors:
Open Access
- 1 March 2021
- conference paper
- Published by IOP Publishing in IOP Conference Series: Earth and Environmental Science
- Vol. 700 (1) , 012050
Abstract
In 2016, Indonesia is concerning about the acceleration of public infrastructure projects through the existence of government strategy projects that spread across several project sectors, including in highway projects. Totally, there is a 44 highway strategic project in Indonesia and several of them are currently in Central Java. Unfortunately, as a national strategic project, even though all of these projects are prioritized in their construction process, the implementation of the national strategic projects are faced up problems especially related to high pressure from the government that has an impact to project cost even causing cost overrun including in highway strategic project. The research aim is to analyze factors causing cost overrun in highway strategic project from owner and contractor perspectives. This study is limited to a case study in Pemalang-Batang Highway Strategic Project. The analysis of the study is using Risk Breakdown Structure to identify risk factors causing cost overrun. From a total of 14 risks identify, both parties agreed to design change as the most risk factor in causing cost overrun in highway strategic project in Indonesia.Keywords
This publication has 4 references indexed in Scilit:
- Risk Assessment and Allocation in Highway Construction Projects in the UAEJournal of Management in Engineering, 2015
- Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from NorwayTransportation Research Part A: Policy and Practice, 2014
- Isu Strategis pada Pengadaan Pengusahaan Jalan Tol dalam Kerjasama Pemerintah dan SwastaJournal of Civil Engineering, 2013
- Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction ProjectsJournal of Construction Engineering and Management, 2010