A Simulation Study of Sequencing Rules in a Kanban‐Controlled Flow Shop*
Authors:
- 1 July 1991
- journal article
- research article
- Published by Wiley in Decision Sciences
- Vol. 22 (3) , 559-582
Abstract
This paper addresses the problem of sequencing in decentralized kanban‐controlled flow shops. The kanban production control system considered uses two card types and a constant withdrawal period. The flow shops are decentralized in the sense that sequencing decisions are made at the local workstation level rather than by a centralized scheduling system. Further, there are no material requirements planning (MRP)‐generated due dates available to drive dispatching rules such as earliest due date, slack, and critical ratio.Local sequencing rules suitable for the decentralized kanban production‐control environment are proposed and tested in a simulation experiment. These rules are designed so that they can be implemented with only the information available at the workstation level. Example sequencing problems are used to show why the shortest processing time rule minimizes neither average work‐in‐process inventory nor average finished‐goods withdrawal kanban waiting time. Further, it is shown how work station supervisors can use the withdrawal period, in addition to the number of kanbans, to manage work‐in‐process inventories.Keywords
This publication has 17 references indexed in Scilit:
- Using the Kanban in a job shop environmentInternational Journal of Production Research, 1988
- Analyzing Simulation Experiments with Common Random NumbersManagement Science, 1988
- Just-in-time manufacturing system: a periodic pull systemInternational Journal of Production Research, 1985
- Sequencing Rules and Due-Date Assignments in a Job ShopManagement Science, 1984
- Simulation studies in job shop scheduling—IIComputers & Industrial Engineering, 1984
- Simulation studies in job shop sheduling—I a surveyComputers & Industrial Engineering, 1984
- A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEMDecision Sciences, 1983
- A state-of-the-art survey of dispatching rules for manufacturing job shop operationsInternational Journal of Production Research, 1982
- Sequencing Two-Machine Flow-Shops with Finite Intermediate StorageManagement Science, 1975
- Network Dispatching by the Shortest-Operation DisciplineOperations Research, 1962