Correlating Bid Price with the Number of Bidders and Final Construction Cost of Public Street Projects
- 1 January 2010
- journal article
- Published by SAGE Publications in Transportation Research Record: Journal of the Transportation Research Board
- Vol. 2151 (1) , 3-10
Abstract
The vast majority of highway and street projects in the United States are procured by state or local governments through a competitive bidding process. In a competitively bid public project, awarding the contract to the lowest bidder is a predominant practice. A few studies measured the effect of awarding the contract to the lowest bidder on construction cost growth. This paper analyzes a sample of 435 bids on 113 public street projects in Clark County, Nevada, to determine a correlation between a lowest bid price and construction cost growth. The sample included projects completed between 1991 and 2008 and more than $554 million in construction value. The study also determined a correlation between the number of bidders and the deviation of the bid cost from the engineers’ estimate. The study showed no correlation between the lowest bid price and the construction cost growth. It showed that public owners would have received the lowest construction bid price if more bidders had been involved in the bidding process. The study found a strong correlation between the lowest bid price and the final construction cost. Therefore, a regression model was developed to predict the final construction cost of a street project by using the lowest bid price. A validation of the model showed that on average the predicted cost of a project was within 3.51% of the actual construction cost. Other findings included recommendations for future study.Keywords
This publication has 15 references indexed in Scilit:
- Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery MethodsJournal of Construction Engineering and Management, 2009
- Analysis of the Impacts of the Number of Bidders Upon Bid ValuesPublic Works Management & Policy, 2008
- Relating Cost Growth from the Initial Estimate to Design Fee for Transportation ProjectsJournal of Construction Engineering and Management, 2007
- Benchmarking of Large Design–Build Highway ProjectsTransportation Research Record: Journal of the Transportation Research Board, 2007
- Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of BiddersJournal of Construction Engineering and Management, 2005
- Cost overruns in road construction—what are their sizes and determinants?Transport Policy, 2004
- Comparison of U.S. Project Delivery SystemsJournal of Construction Engineering and Management, 1998
- A Multivariate Approach to Construction Contract Bidding Mark-up StrategiesJournal of the Operational Research Society, 1994
- Predictors of Cost‐Overrun RatesJournal of Construction Engineering and Management, 1990
- Competitive Bidding in High-Risk SituationsJournal of Petroleum Technology, 1971