Recent advances and existing challenges in the design of bridge falsework systems
- 1 June 2013
- journal article
- research article
- Published by Taylor & Francis in Civil Engineering and Environmental Systems
- Vol. 30 (2) , 130-145
Abstract
Bridge falsework systems are frequently used in the construction, rehabilitation and retrofit works of bridge structures. These structures have a significant impact on the cost, construction rate and construction safety of the supported permanent structures. However, the relevant stakeholders often do not consider them as important as permanent structures, and in recent years, a high number of accidents involving bridge falsework systems have been reported. A research programme was initiated aiming to contribute to a better knowledge about the structural behaviour, reliability and robustness of bridge falsework systems. In this paper, the advances and existing challenges in the design of bridge falsework systems will be summarised. Additionally, the basis of a framework for the structural design of these structures within the context of a risk-informed decision-making is presented.Keywords
This publication has 9 references indexed in Scilit:
- Bridge Construction Equipment: An Overview of the Existing Design GuidanceStructural Engineering International, 2012
- Failed Bridges2010
- Code Provisions for Wind Loads on Short Road Bridges: Spanish IAP code, UNE-EN 1991-1-4 and 2007 AASHTO LRFD Bridge Design Specifications2010
- Test analysis on hidden defect in high falsework and its effect on structural reliability2009
- Review of Research into Scaffold Structures2009
- Wind Loading of Structures2007
- Design Loads on Structures During Construction2002
- Designers' Guide to EN 1990 Eurocode: Basis of Structural Design2002
- Reliability during temporary erection phasesEngineering Structures, 1998