Evaluation of responsive load participation in optimal satisfying system security constraints
Authors:
- 1 July 2012
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- No. 19325517,p. 1-8
Abstract
With liberalizing electricity market, consumers are incurred more electricity price volatilities. Accordingly, they may present parts of their demand as responsive loads (RLs) with the purpose of reducing the prices and providing favorable reliability level for the system. RLs are identified as resources from demand-side which can participate in reliability-triggered events and/or ancillary services by different demand response (DR) programs. In this paper, RLs take part in Emergency Demand Response Programs (EDRPs) during reliability-triggered events while Demand-Side Ancillary Services Programs (DSASPs) are implemented along with spinning and non-spinning reserves from generation-side to satisfy the system security constraints economically. The Reserve procurement from both sides is carried out by risk curve formed for each bus of system base on the credibility and expected consequences of contingencies and also the responding rate of reserve resources in a short-term stochastic security-constrained unit commitment (SCUC) model. The RBTS and IEEE-RTS are considered to illustrate the effects of participating RLs in the joint energy and reserve market.Keywords
This publication has 11 references indexed in Scilit:
- Demand Response Scheduling by Stochastic SCUCIEEE Transactions on Smart Grid, 2010
- Contingency-Constrained Reserve Requirements in Joint Energy and Ancillary Services AuctionIEEE Transactions on Power Systems, 2009
- Market-Clearing With Stochastic Security— Part I: FormulationIEEE Transactions on Power Systems, 2005
- Scheduling and Pricing of Coupled Energy and Primary, Secondary, and Tertiary ReservesProceedings of the IEEE, 2005
- An Electricity Market With a Probabilistic Spinning Reserve CriterionIEEE Transactions on Power Systems, 2004
- Deterministic/probabilistic contingency evaluation in composite generation and transmission systems2004
- Market Operations in Electric Power Systems2002
- The Benefits of Customer Participation in Wholesale Electricity MarketsThe Electricity Journal, 2002
- Reliability Evaluation of Power Systems1996
- A reliability test system for educational purposes-basic dataIEEE Transactions on Power Systems, 1989