A variant of the permutation flow shop model with variable processing times
Authors:
- 13 June 1997
- journal article
- Published by Elsevier in Discrete Applied Mathematics
- Vol. 76 (1-3) , 123-140
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Flow Shop Scheduling with Resource FlexibilityOperations Research, 1994
- The two-machine permutation flow shop with state-dependent processing timesNaval Research Logistics (NRL), 1993
- Single machine scheduling with nonlinear cost functionsComputers & Operations Research, 1991
- Scheduling of a Two-machine Flowshop with Processing Time Linearly Dependent on Job Waiting-timeJournal of the Operational Research Society, 1989
- Minimization of resource consumption under a given deadline in the two-processor flow-shop scheduling problemInformation Processing Letters, 1989
- General flow-shop scheduling with resource constraintsInternational Journal of Production Research, 1988
- Single facility scheduling with nonlinear processing timesComputers & Industrial Engineering, 1988
- Parallel Machine Scheduling: Processing Rates Dependent on Number of Jobs in OperationManagement Science, 1987
- Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman ProblemOperations Research, 1964
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954