A risk based approach to asset integrity management
Authors:
- Vadim V. SilberschmidtVSVadim V. Silberschmidt
- John B. WintleJWJohn B. Wintle
- 19 October 2012
- journal article
- research article
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 18 (4) , 417-431
Abstract
The paper presents research undertaken for an Engineering Doctorate (EngD) degree at the Centre for Innovative and Collaborative Engineering (CICE) at Loughborough University. The CICE is one of the centres through which the UK's Engineering and Physical Sciences Research Council (EPSRC) operates its EngD programme. Funding for this research was obtained from EPSRC and TWI Ltd, the industrial sponsor of this doctorate, via the CICE. The paper builds on a conference paper presentation by the lead author (Bharadwaj et al., 2007) and has gained from feedback received. The author is grateful to Chris J. Ablitt and Julian B. Speck (both of them previously with TWI Ltd) for their perspectives on risk‐based practices in industry.Keywords
This publication has 6 references indexed in Scilit:
- Risk Based Integrity Modeling of Gas Processing Facilities using Bayesian Analysis2009
- A maintenance prioritisation approach to maximise return on investment subject to time and budget constraintsJournal of Quality in Maintenance Engineering, 2008
- A Practical Approach to Risk Based Assessment and Maintenance Optimisation of Offshore Wind Farms2007
- Optimal maintenance decisions under imperfect inspectionReliability Engineering & System Safety, 2005
- Decisions under Uncertainty2005
- Reliability Assessment2003