Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness
Authors:
- Bruno de Athayde PrataBPBruno de Athayde Prata
- Victor Fernandez-ViagasVFVictor Fernandez-Viagas
- Jose M. FraminanJFJose M. Framinan
- Carlos Diego RodriguesCRCarlos Diego Rodrigues
- 23 May 2022
- journal article
- research article
- Published by Elsevier in Computers & Operations Research
- Vol. 145
Abstract
No abstract availableKeywords
This publication has 46 references indexed in Scilit:
- A multi-objective flow shop scheduling with resource-dependent processing times: trade-off between makespan and cost of resourcesInternational Journal of Production Research, 2011
- Adaptive memory programming for constrained global optimizationComputers & Operations Research, 2010
- Energy-efficient algorithmsCommunications of the ACM, 2010
- A survey of scheduling with controllable processing timesDiscrete Applied Mathematics, 2007
- Comparative evaluation of MILP flowshop modelsJournal of the Operational Research Society, 2005
- Two-machine flowshop scheduling to minimize total tardinessInternational Journal of Systems Science, 1997
- An approximation algorithm for the m-machine permutation flow shop scheduling problem with controllable processing timesEuropean Journal of Operational Research, 1993
- Heuristics for Flowshop Scheduling Problems Minimizing Mean TardinessJournal of the Operational Research Society, 1993
- Alternative Formulations of a Flow-shop Scheduling ProblemJournal of the Operational Research Society, 1989
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983