A Novel Constraint Programming Decomposition Approach for the Total Flow Time Fixed Group Shop Scheduling Problem
Open Access
- 21 January 2022
- journal article
- research article
- Published by MDPI AG in Mathematics
- Vol. 10 (3) , 329
Abstract
This work addresses a particular case of the group shop scheduling problem (GSSP) which will be denoted as the fixed group shop scheduling problem (FGSSP). In a FGSSP, job operations are divided into stages and each stage has a set of machines associated to it which are not shared with the other stages. All jobs go through all the stages in a specific order, where the operations of the job at each stage need to be finished before the job advances to the following stage, but operations within a stage can be performed in any order. This setting is common in companies such as leaf spring manufacturers and other automotive companies. To solve the problem, we propose a novel heuristic procedure that combines a decomposition approach with a constraint programming (CP) solver and a restart mechanism both to avoid local optima and to diversify the search. The performance of our approach was tested on instances derived from other scheduling problems that the FGSSP subsumes, considering both the cases with and without anticipatory sequence-dependent setup times. The results of the proposed algorithm are compared with off-the-shelf CP and mixed integer linear programming (MILP) methods as well as with the lower bounds derived from the study of the problem. The experiments show that the proposed heuristic algorithm outperforms the other methods, specially on large-size instances with improvements of over 10% on average.Keywords
This publication has 32 references indexed in Scilit:
- The Cyclic Scheduling of Material Transporting Robot in Group ShopApplied Mechanics and Materials, 2012
- A GA/TS algorithm for the stage shop scheduling problemComputers & Industrial Engineering, 2011
- A hybrid scatter search for the partial job shop scheduling problemThe International Journal of Advanced Manufacturing Technology, 2010
- Group shops scheduling with makespan criterion subject to random release dates and processing timesComputers & Operations Research, 2010
- A fast tabu search algorithm for the group shop scheduling problemAdvances in Engineering Software, 2005
- An Ant Colony Optimization Algorithm for Shop Scheduling ProblemsJournal of Mathematical Modelling and Algorithms, 2004
- A hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plantsComputers & Chemical Engineering, 2004
- Benchmarks for basic scheduling problemsEuropean Journal of Operational Research, 1993
- The mixed shop scheduling problemDiscrete Applied Mathematics, 1985
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979