Optimization of production control policies in failure-prone homogenous transfer lines
- 8 January 2009
- journal article
- research article
- Published by Taylor & Francis in IIE Transactions
- Vol. 41 (3) , 209-222
Abstract
The production control of homogenous transfer lines with machines that are prone to failure is considered in terms of inventory and backlog costs. Because problem complexity grows with line size, a heuristic method based on the profile of the distribution of buffer capacities in moderate size lines is developed in order to enable the optimization of long lines. A method consisting of an analytical formalism, combined discrete/continuous simulation modeling, design of experiments and response surface methodology is used to optimize a set of transfer lines, with one parameter per machine, for up to seven machines. A profile in the parameter distribution which can be modeled using four-parameters is observed. Consequently, the optimization problem is reduced to four parameters, in turn greatly reducing the required optimization effort. An example of a 20-machine line, optimized at 130 runs, versus 5243 090 runs that would be necessary to solve the 20-parameter problem, is presented to illustrate the usefulness of the parameterized profile.Keywords
This publication has 18 references indexed in Scilit:
- Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systemsIIE Transactions, 2003
- c‐Bottlenecks in serial production lines: Identification andapplicationMathematical Problems in Engineering, 2001
- Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policyInternational Journal of Production Research, 2000
- Production and preventive maintenance rates control for a manufacturing system: An experimental design approachInternational Journal of Production Economics, 2000
- Efficient algorithms for buffer space allocationAnnals of Operations Research, 2000
- An improved decomposition method for the analysis of production lines with unreliable machines and finite buffersInternational Journal of Production Research, 1999
- Experimental design in production and maintenance control problem of a single machine, single product manufacturing systemInternational Journal of Production Research, 1999
- Optimal feedback production planning in a stochastic two-machine flowshopEuropean Journal of Operational Research, 1994
- Notes: Toward Characterizing the Optimal Allocation of Storage Space in Production Line Systems with Variable Processing TimesManagement Science, 1993
- Approximate analysis of transfer lines with unreliable machines and finite buffersIEEE Transactions on Automatic Control, 1989