Strategic real option and flexibility analysis for nuclear power plants considering uncertainty in electricity demand and public acceptance
Authors:
- Michel-Alexandre CardinMCMichel-Alexandre Cardin
- Sizhe ZhangSZSizhe Zhang
- William J. NuttallWNWilliam J. Nuttall
Open Access
- 1 May 2017
- journal article
- research article
- Published by Elsevier in Energy Economics
- Vol. 64, 226-237
Abstract
No abstract availableKeywords
Funding Information
- Engineering and Physical Sciences Research Council (EP/K007580/1)
This publication has 37 references indexed in Scilit:
- Risk communication in South Korea: Social acceptance of nuclear power plants (NPPs)Public Relations Review, 2013
- The Future of Nuclear Power After FukushimaEconomics of Energy and Environmental Policy, 2012
- Nuclear power: Understanding the economic risks and uncertaintiesEnergy Policy, 2010
- Flexibility: a multi-disciplinary literature review and a research agenda for designing flexible engineering systemsJournal of Engineering Design, 2009
- A real options approach to investing in the first nuclear power plant under cost uncertainty: comparison with natural gas power plant for the Tunisian caseInternational Journal of Oil, Gas and Coal Technology, 2009
- Defining changeability: Reconciling flexibility, adaptability, scalability, modifiability, and robustness for maintaining system lifecycle valueSystems Engineering, 2008
- Tactical capacity management under capacity flexibilityIIE Transactions, 2008
- Measuring the Value of Flexibility in Space Systems: A Six‐Element FrameworkSystems Engineering, 2006
- A Probabilistic-Based Design Model for Achieving Flexibility in DesignJournal of Mechanical Design, 1999
- Option pricing: A simplified approachJournal of Financial Economics, 1979