BIM-based optimization of camera placement for indoor construction monitoring considering the construction schedule
Authors:
- Xinyang ChenXCXinyang Chen
- Yifan ZhuYZYifan Zhu
- Hainan ChenHCHainan Chen
- Yewei OuyangYOYewei Ouyang
- Xiaowei LuoXiaowei Luo
- Xiaoling WuXWXiaoling Wu
- 1 October 2021
- journal article
- research article
- Published by Elsevier in Automation in Construction
- Vol. 130
Abstract
No abstract availableKeywords
Funding Information
- Science, Technology and Innovation Commission of Shenzhen Municipality (51778553, 2019M663239)
- National Natural Science Foundation of China (51778553, 2019M663239)
- China Postdoctoral Science Foundation (51778553, 2019M663239)
This publication has 25 references indexed in Scilit:
- Application Areas and Data Requirements for BIM-Enabled Facilities ManagementJournal of Construction Engineering and Management, 2012
- Automated vision tracking of project related entitiesAdvanced Engineering Informatics, 2011
- Automated Object Identification Using Optical Video Cameras on Construction SitesComputer-Aided Civil and Infrastructure Engineering, 2011
- Tracking multiple workers on construction sites using video camerasAdvanced Engineering Informatics, 2010
- Toward automated generation of parametric BIMs based on hybrid video and laser scanning dataAdvanced Engineering Informatics, 2010
- Personnel tracking on construction sites using video camerasAdvanced Engineering Informatics, 2009
- A Methodology for Object Identification and Tracking in Construction Based on Spatial Modeling and Image Matching TechniquesComputer-Aided Civil and Infrastructure Engineering, 2009
- Virus coevolution partheno-genetic algorithms for optimal sensor placementAdvanced Engineering Informatics, 2008
- A Multiobjective Evolutionary Algorithm for Surveillance Sensor PlacementEnvironment and Planning B: Planning and Design, 2008
- Automated camera layout to satisfy task-specific and floor plan-specific coverage requirementsComputer Vision and Image Understanding, 2006