A two-phase resource-constrained project scheduling approach for design and development of complex product systems
- 25 February 2023
- journal article
- research article
- Published by Springer Nature in Operational Research
- Vol. 23 (1) , 1-25
Abstract
No abstract availableKeywords
This publication has 60 references indexed in Scilit:
- An improved version of the augmented ε-constraint method (AUGMECON2) for finding the exact pareto set in multi-objective integer programming problemsApplied Mathematics and Computation, 2013
- Robust optimization for resource-constrained project scheduling with uncertain activity durationsFlexible Services and Manufacturing Journal, 2012
- Multi-objective electricity market clearing considering dynamic security by lexicographic optimization and augmented epsilon constraint methodApplied Soft Computing, 2011
- A survey of variants and extensions of the resource-constrained project scheduling problemEuropean Journal of Operational Research, 2010
- Risk management capability maturity model for complex product systems (CoPS) projectsSystems Engineering, 2008
- Complex Concurrent Engineering and the Design Structure Matrix MethodConcurrent Engineering, 2003
- Structuring product development processesEuropean Journal of Operational Research, 2001
- Applying the design structure matrix to system decomposition and integration problems: a review and new directionsIEEE Transactions on Engineering Management, 2001
- Innovation in Complex Systems Industries: the Case of Flight SimulationIndustrial and Corporate Change, 1995
- Linear lexicographic optimizationOR Spectrum, 1982