Multi-level job scheduling in a flexible job shop environment
Authors:
- 22 October 2013
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 52 (13) , 3877-3887
Abstract
This study deals with a scheduling problem with multi-level job structures in a flexible job shop environment. This scheduling process arises after the part production plans are created by the MRP (material requirement planning) system, therefore the total tardiness measure is considered as an objective function in order to complete the parts by the set due dates. MILP (mixed integer linear programming) model is introduced to mathematically represent the target problem. Owing to the high complexity of the target problem, GA (genetic algorithm) is proposed to solve the problem and additional methods, such as priority rules and local search rules, are applied to improve the performance of GA. Computational examples are shown and the results are discussed in comparison with the results of IBM ILOG CPLEX and IBM ILOG CP Optimizer.Keywords
This publication has 24 references indexed in Scilit:
- Scheduling rules for dynamic shops that manufacture multi-level jobsComputers & Industrial Engineering, 2003
- Flexible Job Shop Scheduling with Multi-level Job Structures.JSME International Journal Series C, 2003
- Dispatching rules for scheduling in assembly jobshops - Part 1International Journal of Production Research, 2000
- Tabu search for the job-shop scheduling problem with multi-purpose machinesOR Spectrum, 1994
- A preliminary investigation of multi-attribute based sequencing rules for assembly shopsInternational Journal of Production Research, 1991
- Sequencing rules, progress milestones and product structure in a multistage job shopJournal of Operations Management, 1989
- The effects of product structure and sequencing rule on assembly shop performanceInternational Journal of Production Research, 1989
- Priority Assignment Procedures in Multi-Level Assembly Job ShopsIIE Transactions, 1987
- Evaluating scheduling policies in a multi-level assembly systemInternational Journal of Production Research, 1986
- AN EVALUATION OF SEQUENCING RULES FOR AN ASSEMBLY SHOPDecision Sciences, 1985