Robust Measurement Design by Placing Synchronized Phasor Measurements on Network Branches
Authors:
- 15 December 2009
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Systems
- Vol. 25 (1) , 38-43
Abstract
This paper is concerned about optimal placement of synchronized phasor measurements that can monitor voltage and current phasors along network branches. Earlier investigations on placement of phasor measurement units (PMUs) have assumed that a PMU could be placed at a bus and would provide bus voltage phasor as well as current phasors along all branches incident to the bus. This study considers those PMUs which are designed to monitor a single branch by measuring the voltage and current phasors at one end of the monitored branch. It then determines the optimal location of such PMUs in order to make the entire network observable. The paper also addresses the reliability of the resulting measurement design by considering loss or failure of PMUs as well as contingencies involving line or transformer outages. Developed placement strategies are illustrated using IEEE test systems.Keywords
This publication has 8 references indexed in Scilit:
- Benefits of Synchronized-Measurement Technology for Power-Grid Applications2007
- Placement of PMUs to Enable Bad Data Detection in State EstimationIEEE Transactions on Power Systems, 2006
- Phasor Measurement Unit Placement Techniques for Complete and Incomplete ObservabilityIEEE Transactions on Power Delivery, 2005
- Observability analysis and measurement placement for systems with PMUs2005
- Generalized observability analysis and measurement classificationIEEE Transactions on Power Systems, 1998
- Power system observability with minimal phasor measurement placementIEEE Transactions on Power Systems, 1993
- Synchronized phasor measurements in power systemsIEEE Computer Applications in Power, 1993
- The least squares problem and pseudo-inversesThe Computer Journal, 1970