Spatial scheduling algorithm minimising makespan at block assembly shop in shipbuilding
Authors:
- 15 April 2010
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 49 (8) , 2351-2371
Abstract
Spatial scheduling pursues optimal sequencing and dynamic spatial layouts that satisfy traditional restrictions in resource capacity and due dates. In shipbuilding, block spatial scheduling can be regarded as arranging some polygonal objects within rectangular work plates in an optimal sequence. This problem is important because of its impact on shipbuilding productivity and it is a NP-hard problem due to the complex constraints. In this paper, detailed analysis and mathematical description are made on block shape and block intersection. Based on the investigations of the characteristics of block shapes, the corresponding processing techniques and typical constraints, a mathematical model for block spatial scheduling is developed. Subsequently, a block spatial scheduling greedy algorithm with the objective of minimising makespan is presented using several proposed spatial scheduling strategies. The algorithm is implemented by developing a block spatial scheduling system at a block assembly shop, through which visual scheduling results of daily block layouts and the progress charts for all blocks can be obtained. Moreover, several main spatial scheduling performance indicators are proposed for comparing the proposed greedy algorithm with the existing grid algorithm and manual methods. A case study is made with real data from a shipyard, and the result shows that better performance and higher efficiency can be achieved in a short computational time.Keywords
This publication has 13 references indexed in Scilit:
- A multi-objective production scheduling case study solved by simulated annealingEuropean Journal of Operational Research, 2007
- Sufficient search space for spatial expert systemsExpert Systems with Applications, 2000
- Delivery date decision support system for the large scale make-to-order manufacturing companies: A Korean electric motor company caseProduction Planning & Control, 1999
- Single machine group scheduling to minimize mean flow time subject to due date constraintsProduction Planning & Control, 1998
- Developing scheduling systems for Daewoo Shipbuilding: DAS projectEuropean Journal of Operational Research, 1997
- A spatial scheduling system and its application to shipbuilding: DAS-CURVEExpert Systems with Applications, 1996
- Multiple and bicriteria scheduling: A literature surveyEuropean Journal of Operational Research, 1995
- On Three-Dimensional PackingSIAM Journal on Computing, 1990
- Spatial Planning: A Configuration Space ApproachIEEE Transactions on Computers, 1983
- Optimal Allocation of Two-Dimensional Irregular Shapes Using Heuristic Search MethodsIEEE Transactions on Systems, Man, and Cybernetics, 1980