Resource allocation for a stochastic CPM-type network through perturbation analysis
Author:
- Yat-Wah WanYWYat-Wah Wan
- 1 December 1994
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 79 (2) , 239-248
Abstract
No abstract availableThis publication has 10 references indexed in Scilit:
- Consistency of infinitesimal perturbation analysis estimators with ratesQueueing Systems, 1991
- Do today's projects need powerful network planning tools?International Journal of Production Research, 1991
- Derivatives of the expected delay in the GI/G/1 QueueJournal of Applied Probability, 1990
- Project bidding under deterministic and probabilistic activity durationsEuropean Journal of Operational Research, 1990
- Some efficient multi-heuristic procedures for resource-constrained project schedulingEuropean Journal of Operational Research, 1990
- Planning Queueing SimulationsManagement Science, 1989
- Perturbation Analysis Gives Strongly Consistent Sensitivity Estimates for the M/G/1 QueueManagement Science, 1988
- A comparison between the VERT program and other methods of project duration estimationOmega, 1987
- Bounding the Project Completion Time Distribution in PERT NetworksOperations Research, 1985
- A gradient technique for general buffer storage design in a production lineInternational Journal of Production Research, 1979