A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages
Author:
- 1 July 2014
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 236 (2) , 433-444
Abstract
No abstract availableThis publication has 24 references indexed in Scilit:
- Metaheuristic methods in hybrid flow shop scheduling problemExpert Systems with Applications, 2011
- Solution approaches for a real-life resource-constrained parallel machine scheduling problemThe International Journal of Advanced Manufacturing Technology, 2011
- A practical tutorial on the use of nonparametric statistical tests as a methodology for comparing evolutionary and swarm intelligence algorithmsSwarm and Evolutionary Computation, 2011
- Heuristic algorithms for preemptive scheduling in a two-stage hybrid flowshop with additional renewable resources at each stageComputers & Industrial Engineering, 2010
- DEA model with shared resources and efficiency decompositionEuropean Journal of Operational Research, 2010
- A genetic algorithm and a simulated annealing algorithm combined with column generation technique for solving the problem of scheduling in the hybrid flowshop with additional resourcesComputers & Industrial Engineering, 2009
- A new heuristic for scheduling the two-stage flowshop with additional resourcesComputers & Industrial Engineering, 2008
- Flow Shop Scheduling with Resource FlexibilityOperations Research, 1994
- On the two-phase method for preemptive schedulingEuropean Journal of Operational Research, 1988
- Decomposition Principle for Linear ProgramsOperations Research, 1960