Abstract
It is shown how production management constraints can be taken into account as early as the design stage of the product. It is then shown that the indication of physical and economic performances is a means to obtain integration and to continually improve the manufacturing processes. To perform continuous and efficient evaluation of physical and economic performances, the concept of activity is introduced, now acknowledged as a basic concept of cost management systems. A modelling approach is then proposed to allow each member of the design team, in a concurrent engineering context, to perform activity based modelling and estimations with simulation. After describing the set of possible situations in which this approach can be used, an application case is presented concerning a French firm, and the advantages and disadvantages of the approach are discussed.