Transmission line switching in power system planning with large scale renewable energy
Authors:
- 1 March 2015
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Abstract
Transmission line congestion is a critical factor that will affect power system operational cost. With more renewable energy in the future grid and the intermittence of nature, transmission line congestion will be more frequent. Due to the congestion, renewable plant has to curtail some available generation. This paper investigates the use of active transmission line switching operation in power system planning with NERC N-1 reliability requirement for congestion reduction to increase the usage of renewable generation. During line switching, TCSC and energy storage device such as battery are proposed to resolve the potential stability issue. We demonstrate our approach by a simplified WSCC 9 bus system.Keywords
This publication has 8 references indexed in Scilit:
- Line capacity expansion and transmission switching in power systems with large-scale wind powerIEEE Transactions on Power Systems, 2012
- A review of transmission switching and network topology optimization2011
- Effective utilization of large-capacity battery systems for transient stability improvement in multi-machine power system2011
- Co-Optimization of Generation Unit Commitment and Transmission Switching With N-1 ReliabilityIEEE Transactions on Power Systems, 2010
- Transient stability enhancement by TCSC controllers using remote input signals2010
- Optimal Transmission Switching With Contingency AnalysisIEEE Transactions on Power Systems, 2009
- An Economic Dispatch Model Incorporating Wind PowerIEEE Transactions on Energy Conversion, 2008
- Corrective Switching Algorithm for Relieving Overloads and Voltage ViolationsIEEE Transactions on Power Systems, 2005