Producing a schedule for industrial construction that optimizes resource utilization and meets the delivery dates of competing projects is a complicated task. The scheduler must consider several constraints and uncertainties including limited space, crew skill, and shipment processes in the module yard. This paper presents an integrated simulation-based scheduling framework that pulls the data from a database interface, runs the simulation model, and provides different graphical reports to the user. Although this model has been implemented successfully in the industry, some challenges are not yet solved. A distributed simulation system using High Level Architecture (HLA) is proposed to break down the simulation into a number of components to enhance the performance of the system. This system also helps to reuse these components in future projects and to facilitate the expansion of the model, enabling more complicated process simulations.