Exploring water-level fluctuation amplitude in an approach channel under the regulation of a dual cascade hydro-plant in the dry season
Authors:
Open Access
- 4 February 2022
- journal article
- research article
- Published by IWA Publishing in Water Supply
- Vol. 22 (4) , 4159-4175
Abstract
Water-level fluctuation is a crucially important hydraulic factor to meet the safety of ship navigation. Due to the uncertainty and evolution of the maximum amplitude of water-level variation in the approach channel, the river reach between two dams located along the Yangtze River in China is selected as a study area and the impact of various operating conditions of the cascade hydro-plant on the maximum amplitude of water-level variation at typical sites is revealed combining the orthogonal test method and a hydrodynamic model. In addition, the critical threshold for the water-level variation at the lower lock head of the ship lift is explored using maximum entropy method. Results demonstrate that flow variation and regulation time are the most prominent factors affecting water-level fluctuation at the lower lock head of the ship lift, and the existing standard (0.5 m within 1 h and 0.3 m within 30 min) for controlling the maximum variation in water level at the lower lock head of the ship lift is reasonable and more safety oriented. This study provides a novel perspective to understand the response of water-level fluctuation to the stochasticity of operating conditions for the cascade hydropower stations.Keywords
Funding Information
- National Key Research and Development Program of China (2016YFC0401906)
- Three Gorges Follow-up Work Research Project (SXXTD-2018-8)
This publication has 17 references indexed in Scilit:
- Numerical modeling of sedimentation control scenarios in the approach channel of the Nakdong River Estuary Barrage, South KoreaInternational Journal of Sediment Research, 2016
- Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving ConstraintsJournal of Water Resources Planning and Management, 2016
- SHIP‐LOCK–INDUCED SURGES IN AN IMPOUNDED RIVER AND THEIR IMPACT ON SUBDAILY FLOW VELOCITY VARIATIONRiver Research and Applications, 2013
- Shuifu- Yibin Channel Regulation Affected by Unsteady Flow Released From Xiangjiba Hydropower StationProcedia Engineering, 2012
- Impact upon Navigation Conditions of River Reach between the Two Dams by Peak Shaving at Three Gorges Hydropower StationProcedia Engineering, 2012
- Gate Regulation Speed and Transition Process of Unsteady Flow in ChannelJournal of Hydrodynamics, 2008
- An improved algorithm for the multidimensional moment-constrained maximum entropy problemJournal of Computational Physics, 2007
- Maximum entropy pdfs and the moment problem under near-Gaussian conditionsProbabilistic Engineering Mechanics, 2003
- Flow Fields in Lower Lock Approaches Induced by Hydro‐Plant ReleasesJournal of Waterway, Port, Coastal, and Ocean Engineering, 1991
- A Mathematical Theory of CommunicationBell System Technical Journal, 1948