Solving two-stage hybrid flow shop using climbing depth-bounded discrepancy search
- 31 March 2011
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 60 (2) , 320-327
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- Climbing depth-bounded discrepancy search for solving hybrid flow shop problemsEuropean J. of Industrial Engineering, 2007
- Optimal Scheduling of a Two-stage Hybrid Flow ShopMathematical Methods of Operations Research, 2006
- A case study in a two-stage hybrid flow shop with setup time and dedicated machinesInternational Journal of Production Economics, 2003
- Variable neighborhood search: Principles and applicationsEuropean Journal of Operational Research, 2001
- Heuristic algorithms for the two-stage hybrid flowshop problemOperations Research Letters, 1997
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stageAnnals of Operations Research, 1997
- A computational study of heuristics for two-stage flexible flowshopsInternational Journal of Production Research, 1996
- Preemptive scheduling in a two-stage multiprocessor flow shop is NP-hardEuropean Journal of Operational Research, 1996
- Minimizing makespan in hybrid flowshopsOperations Research Letters, 1994
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988