Delphi-Based Prioritization of Climate and Weather- Related Risks and Their Time-Cost-Quality-Safety Effects on Public Infrastructure Projects in Leyte, Philippines
Climate and weather-related hazards pose significant challenges to infrastructure project implementation in Leyte Province, Philippines, where typhoons, heavy rainfall, flooding, landslides, and coastal hazards can disrupt construction activities and affect project performance. This study aimed to identify, assess, and prioritize climate and weather-related risks affecting public infrastructure projects in Leyte Province and to determine their effects on project time, cost, quality, and safety. A three-round Delphi study was conducted with 18 infrastructure professionals, all of whom participated in each round. Round 1 focused on risk identification, while Rounds 2 and 3 assessed and validated the frequency and severity of the identified risks using a five-point Likert scale. Frequency Index, Severity Index, and Importance Index were used to assess and prioritize the risks, while Pareto Analysis was applied to determine their cumulative contribution to the overall risk profile. The Kruskal–Wallis test was used to examine differences in expert assessments across selected respondent characteristics. The study identified 49 climate and weather-related risks grouped into seven themes. The three highest-ranked risks were disruption of project logistics and material delivery during typhoon events (II = 0.693), delay or suspension of construction activities due to typhoon events (II = 0.667), and storm surge impacts on coastal infrastructure (II = 0.604). The TCQS assessment showed that these risks had varying effects on project performance, with logistics disruption having its strongest effects on cost and quality, while typhoon-related work suspension had its strongest effects on time and safety. Overall, the findings demonstrate that climate and weather-related risks should be explicitly considered in public infrastructure planning and construction management in Leyte Province, particularly in prioritizing risks and developing measures to minimize their effects on project performance.